X SERIES CHAMBER PERFORMANCE FOR FORD L-467
The Auto Technology X Series uses Advanced Climate Control and a Swaying Spray Bar to perform Ford L-467 cyclic corrosion testing. Review the chamber requirements, equipment, measured climate cycles, gauge-loss measurements, and mass-loss results below.
- Advanced Climate Control
Cooling, Heating & RH - Swaying Spray Bar
Direct Solution Application - PC Sequencing
Spray & Climate Steps - Measured Performance
Climate & Panel Results
Ford L-467 Requirements
Ford L-467 combines direct salt-solution application with controlled cooling, heating, humidity, and drying. The first five days repeat a 24-hour cycle; the final two days remain at 50 °C and 70% RH. The chamber must perform the following exposures and transitions.
| Ford L-467 Chamber Requirements |
|---|
| Six-hour wet phase. Reach 25 °C and keep specimens wet, with spray near the beginning, middle, and end. |
| Rapid cooling. Cool from 50 °C to below 30 °C within 30 minutes and reach 25 °C within one hour. |
| Controlled humid heating. Raise temperature from 25 °C to 40 °C within 30 minutes without premature specimen drying; 95% RH is the prescribed climate setting. |
| Two-hour drying transition. Transition linearly from 40 °C / 95% RH to 50 °C / 70% RH. Corroding surfaces must have no visible wetness at the end. |
| 50 °C / 70% RH exposure. Hold for 15.5 hours on Days 1–5 and throughout the final 48 hours. Mean offsets: ±2 °C and ±5% RH; five-minute mean fluctuations about the actual mean: ±1 °C and ±3% RH. |
| Direct electrolyte application. Apply 0.50 ±0.05% NaCl solution by weight as direct downfall. Target an average 5 L/m² per six-hour wet phase; average must not exceed 10 L/m². Each local position must receive 3–15 L/m². |
| Circulation and fresh air. Distribute conditioned air across the test area; continuously renew air at no less than 1 m³/h per m² of test area. |
Ambient Laboratory Conditions
For operation with Auto Technology’s Advanced Climate Control, maintain the laboratory at 25 °C ± 5 °C (68–86 °F) and 45% ± 10% relative humidity (35–55% RH). The system draws room air into the chamber during cooling, so the room’s HVAC and ventilation must maintain these conditions while the chamber operates. Additional environmental controls may be required if these conditions cannot be maintained.
The requirements summarized here follow Ford TM 00.00-L-467. L-467 reproduces the salt-loading and climatic portions of Ford's R-343 full-vehicle corrosion procedure in a laboratory exposure. Auto Technology uses the chamber records and verification-panel measurements below to check that the X Series performs as intended under those laboratory conditions.
Ford L-467 History and Chamber Development
Ford developed L-467 to reproduce the salt loading and climate of its R-343 full-vehicle proving-ground test in a laboratory chamber. By 2008, Ford and Volvo had established a seven-day cycle: five days of intermittent salt spray and controlled climate transitions, followed by a 48-hour hold at 50°C and 70% RH. In 2009, ATC participated in early round-robin testing with Ford’s Central Laboratory to refine the temperature and humidity profile of the first American purpose-built L-467 chamber.
ATC originally used purpose-built mechanical cooling units to achieve the required temperature and humidity transitions. Labs can still buy a mechanical cooling version. Today, ATC’s Advanced Climate Control system handles those transitions through coordinated airflow, ventilation, and humidity control. An auxiliary blower brings in cooler room air and vents warm chamber air. Internal circulation distributes air around the specimens, and a cool-mist spray controls humidity and helps cool the specimens and chamber. Together, these functions bring the chamber from 50°C to below 30°C within 30 minutes and to 25°C within one hour. Temperature and RH sensors in the exposure zone feed readings to the PC controls, which adjust the chamber functions and record the measured conditions.
For the complete test procedure and specimen evaluation requirements, visit Ford L-467 testing services.
Auto Technology Methods
How the X Series Performs the Exposure
Ford L-467 is one of the more complex OEM corrosion cycles, combining direct spray, rapid cooling, humid heating, and controlled drying. Auto Technology previously used mechanical cooling units for this exposure, while other manufacturers use refrigerated air-conditioning systems. The X Series combines Advanced Climate Control and the Swaying Spray Bar to automate the exposure at a lower cost and without the additional room heat load from an air-conditioning system.
Swaying Spray Bar
The spray bar moves overlapping nozzle patterns across the specimen area to distribute the 0.5% NaCl solution. Ford identifies a moving spray device, such as a swaying rail, as the most reliable means of obtaining uniform downfall.
PC sequencing places spray events near the beginning, middle, and end of the wet phase.

Advanced Climate Control
Advanced Climate Control combines RH sensing, cool-mist humidification, heating, dry-air dehumidification, air circulation, and auxiliary-blower cooling in one PC-controlled system. Together, these components perform the return from 50 °C to the 25 °C wet phase, humid heating, the two-hour drying ramp, and the 50 °C / 70% RH hold. The PC program coordinates the climate sequence and records temperature and RH setpoints and measured readings.
ATC measures temperature and RH in the center of the exposure zone, alongside the specimens. This gives the control system feedback from the actual exposure area instead of an isolated sensor location.
Verified Chamber Performance
The results below are actual records from Auto Technology’s validation testing of the X Series with Advanced Climate Control and the Swaying Spray Bar. The climate chart shows three cycles using the selected starting points. The six-week gauge-loss measurements and one- and two-week mass-loss results show the corrosion produced on exposed panels and coupons.
Verification checks that the chamber works as intended. Auto Technology evaluates the recorded temperature and humidity cycle together with the corrosion response of the verification panels. The climate records show the programmed exposures and transitions; the gauge-loss results check the combined effect of spray, temperature, humidity, drying, and airflow on the panels.
Temperature & RH Across the Recorded Cycles
Each cycle view runs from its selected starting point to the next cycle’s starting point. Brief sensor disturbances during compressed-air blow-off are corrected in both curves.
The transition view shows the recorded heating and drying ramps. Times are measured from the selected cycle’s starting point.
The cooling view shows the recorded return from 50 °C before the next cycle’s starting point. Its clock starts at the beginning of that cooling sequence, with Ford’s 30-minute and one-hour checkpoints marked.
Six-Week Gauge-Loss Results
After six weeks, the three verification panels produced corrected average gauge losses of 152.7, 178.5, and 196.0 µm. Each panel met Ford's 150–250 µm target.
The validation exposure included approximately 30 lb of stainless steel to simulate a loaded chamber and check temperature and humidity transitions.

Auto Technology coupon locations. ATC placed verification panels at the left, middle, and right of the chamber to compare the corrosion response across those positions.
Each panel has six reference-area readings and twelve corroded-area readings. The table shows their means and standard deviations, the corrections applied, and the maximum corrected sector loss. Corrected net gauge loss is the reference-area mean minus the corroded-area mean, plus the 31 µm rust correction and minus the 5 µm E-coat correction. These corrections apply to the results shown here; the E-coat correction is determined for each panel group, and the rust correction is used only where CA 006-01 permits it.
| Measurement / calculation (µm) | Left | Middle | Right |
|---|---|---|---|
| Reference-area mean | 766.7 | 770.0 | 770.0 |
| Reference-area standard deviation | 5.16 | 0.00 | 0.00 |
| Corroded-area mean | 640.0 | 617.5 | 600.0 |
| Corroded-area standard deviation | 10.44 | 41.81 | 22.96 |
| Uncorrected difference | 126.7 | 152.5 | 170.0 |
| Rust correction | 31.0 | 31.0 | 31.0 |
| E-coat correction | -5.0 | -5.0 | -5.0 |
| Corrected net gauge loss | 152.7 | 178.5 | 196.0 |
| Maximum corrected sector loss | 176.0 | 236.0 | 226.0 |
View all 54 individual thickness readings
All thickness readings are in µm.
| Reference-area reading | Left | Middle | Right |
|---|---|---|---|
| 1 | 770 | 770 | 770 |
| 2 | 760 | 770 | 770 |
| 3 | 760 | 770 | 770 |
| 4 | 770 | 770 | 770 |
| 5 | 770 | 770 | 770 |
| 6 | 770 | 770 | 770 |
| Corroded-area reading | Left | Middle | Right |
|---|---|---|---|
| 1 | 650 | 640 | 610 |
| 2 | 650 | 650 | 590 |
| 3 | 650 | 580 | 590 |
| 4 | 650 | 640 | 600 |
| 5 | 640 | 560 | 590 |
| 6 | 630 | 580 | 590 |
| 7 | 640 | 640 | 610 |
| 8 | 620 | 690 | 630 |
| 9 | 630 | 590 | 570 |
| 10 | 640 | 630 | 650 |
| 11 | 630 | 650 | 600 |
| 12 | 650 | 560 | 570 |
Supplemental Mass-Loss Results
Additional coupons exposed alongside the gauge-loss panels produced the following mean mass losses. Each average represents two coupons.
| Exposure set | Duration | Mean mass loss (g) |
|---|---|---|
| One-week set 1 | 1 week | 0.8349 |
| One-week set 2 | 1 week | 0.9394 |
| Two-week set | 2 weeks | 1.7249 |
| One-week set 3 | 1 week | 1.0578 |
Ford Gauge-Loss Verification: Placement, Frequency & Measurement
Ford L-467 uses e-coated steel panels with a prepared bare strip to check the corrosion produced by the chamber.
Coupon Placement and Preparation
Mount the panels at 20° ± 5° from vertical, with the uncoated area toward the bottom. Remove the tape covering the prepared bare strip before testing.
Position the panels approximately 1 m below the automated spray heads. Keep their exposed faces clear of other specimens so they receive the spray, and use noncorrosive supports that allow airflow and drainage.
When Verification Is Required
Run the six-week verification quarterly and for each new exposure situation. This includes equipment changes or significant changes to thermal mass or air circulation that disturb chamber homogeneity. L-467 does not explicitly require a fresh set of coupons with every product test, but a substantial change in chamber loading may require verification.
The six-week period applies to chamber verification. The duration of a component test comes from the applicable Ford component or material requirement.
Auto Technology Measurement Equipment
Auto Technology measures gauge loss ultrasonically under FLTM CA 006-01. L-467 also permits the micrometer method in FLTM CA 005-01.
| Equipment | Auto Technology Uses |
|---|---|
| Ultrasonic thickness gauge | Olympus 38DL Plus |
| Probe | M208-RM |
| Panel holder and measurement template | Holds the panel and guides the probe to separate measurement points. |
| Couplant | Glycerin between the probe and the coated back of the panel. |
Measuring Gauge Loss
After exposure, remove thick rust deposits as needed and measure through the fully e-coated back of the panel. Use Auto Technology’s gauge measurement template for consistent probe placement. Take six reference readings opposite an area coated on both sides and twelve readings opposite the corroded strip. Calculate the difference between the two averages, apply the required corrections under Ford CA 006-01, and report the corrected gauge loss for each panel.
Configure an X Series for Your Ford L-467 Program
Send your specimen dimensions, quantity, total mass, loading arrangement, and Ford test requirement. ATC can specify the chamber size, Advanced Climate Control package, Swaying Spray Bar, and supports for your exposure.