SAE J2334 CYCLIC CORROSION TEST CHAMBER – ATC X2334

Thin horizontal red-to-gray gradient bar

Specify the salt-application method when ordering an Auto Technology X2334 SAE J2334 cyclic corrosion chamber: direct spray, air-atomized fog, or immersion. All three configurations run the same humid and dry stages. Your choice determines the equipment used to keep the parts wet during the 15-minute salt stage.

Front view of the X Series Size 40 cyclic corrosion chamber.
Front view of the X Series Size 40 cyclic corrosion chamber.

Which wetting method does your lab use?

Start with the customer’s test plan. For comparison with earlier results or another lab, confirm which salt-application method was used. Spray, fog and immersion can produce different results even when the temperature, humidity and cycle times match.

Direct spray

Two adjustable spray heads wetting test parts
Adjustable nozzles apply salt solution directly to the specimens.

Adjustable nozzles deliver solution directly to the parts. Position the heads around the loaded fixture so every required surface stays visibly wet for the full 15 minutes. Spray may be periodic or continuous. Use enough flow to maintain wetness without disturbing coatings or corrosion products.

Air-atomized fog

Additional fog towers for the air-atomized fog configuration.
Additional fog towers for the air-atomized fog configuration.

Additional fog towers distribute atomized solution through the exposure zone. This configuration supports the higher J2334 collection rate of 2–4 mL/h. Allow space for the collectors with the parts installed and document the measured rate.

Immersion

X Series immersion equipment with an external salt-solution tank.
X Series immersion equipment with an external salt-solution tank.

A pump transfers solution from an external tank into the chamber. The parts stay immersed for the full 15 minutes, then the solution drains back before drying. Specify the required immersion depth with the parts mounted. Immersion was the basis for most of the standard’s development work.

Need more than one method? ATC can install all three wetting systems in one X2334. List each method your lab needs in the RFQ so the quote includes the corresponding hardware.

Immersion equipment and fill sequence

View the Size 40 SAE J2334 immersion chamber

SAE J2334 daily cycle

StageDurationExposure
Humid6 hours50 ±2 °C and 100% RH. Specimens remain visibly moist or wet.
Salt application15 minutesAt ambient conditions, the selected system keeps the specimens visibly wet throughout the interval.
Dry17 hours 45 minutes60 ±2 °C and 50 ±5% RH, with air circulation around the parts.

The ramp into drying counts toward the dry stage. The ramp back to humidity counts toward the next humid stage. For five-day operation, maintain dry-stage conditions over the weekend. For seven-day operation, continue the daily cycle.

Each wetting method uses the same mixed salt solution: 0.5% sodium chloride, 0.1% calcium chloride and 0.075% sodium bicarbonate in deionized water.

Optional solution mixing tank
Optional solution mixing tank configured for added wetting
Optional mixing tank for preparing SAE J2334 salt solution.

SAE J2334 test procedure and exposure requirements

Advanced Climate Control and computer control

All three X2334 configurations include Advanced Climate Control for the humid stage and the 50% RH hold during drying. The package requires computer-controlled pneumatic cover lifters to hold the lid closed while the blowers run.

The computer control sequences the humid exposure, operates the installed wetting system, and records chamber temperature and relative humidity throughout the cycle.

X Series computer displaying the chamber software
X Series computer control interface.
View climate-control and chamber hardware
Chamber temperature RTD, blow-off and protected RH probe
Temperature RTD with air blow-off and shielded relative humidity probe.
Pneumatic cover lifter on an X Series corrosion chamber
Pneumatic cylinder for the computer-controlled cover lifter.
X Series control cabinet with solenoid banks, bubble tower and blower system
Internal solenoid banks, bubble tower and blower system.

Chamber sizes and drawings

Size for the largest loaded fixture. Direct spray needs a clear path to the exposed surfaces, fog needs space for collectors, and immersion needs enough operating depth to cover the parts. The base dimensions cover the chamber cabinet; the immersion configuration also requires floor space for its external tank.

SizeNominal capacity (ft³)Approx. volume (L)Internal L × W × H (in.)Base L × W (in.)
202059450 × 29 × 2595 × 43
303089175 × 29 × 25120 × 43
40391,10675 × 36 × 25120 × 50
90902,55076 × 45 × 45132 × 68
1101123,19489 × 73 × 30137 × 85
View Size 20 drawings
Base length: 95 in.
View Size 40 drawings
Base length: 120 in.
View Size 110 drawings
Base length: 137 in.

X Series chamber sizes and configurations

Installation and utilities

Provide a noncondensing laboratory environment at 25 ±5 °C and 45 ±10% RH for Advanced Climate Control.

UtilityConnection or service
DI waterASTM D1193 Type IV, 20–40 psi.
Compressed airClean, dry, oil-free air at 65–85 psi at the chamber inlet during operation.
ExhaustVent outdoors or connect to a suitable scrubber.
DrainOpen floor drain for the 1-inch gravity drain hose.
PowerDedicated circuit and fused disconnect sized for the ordered configuration.
Electrical service by wetting method and chamber size

Current ratings in amperes at 60 Hz. A dash indicates that no rating is listed for that supply.

ConfigurationSize208 V / 1 ph208 V / 3 ph240 V / 1 ph240 V / 3 ph460 V / 3 ph
Direct spray or fog203530302616
Direct spray or fog30 or 404440383420
Direct spray or fog905353474725
Immersion20—68—6131
Immersion30 or 40—77—6936
Immersion90—165—15575

For Size 110 and combined wetting packages, obtain the connected load from the quoted factory drawing. Use the final drawing to size the disconnect for the ordered chamber.

Utility Connections & Exhaust Details
  • DI water and compressed air: ⅜-in OD tubing on Sizes 20, 30, 40 and 90; ½-in OD on Size 110. Install an industrial oil/water separator upstream of the air connection.
  • Exhaust: 2-in CPVC on Sizes 20–90 and 4-in CPVC on Size 110. Support and slope piping for condensate drainage. Exterior runs longer than 15 ft require additional exhaust assistance; confirm the arrangement with ATC.
  • Drain: Route the 1-in gravity drain hose to an open floor drain.
  • Laboratory: Maintain 25 °C ±5 °C for Advanced Climate Control and noncondensing room conditions.

Shut down the chamber if a required utility is interrupted. See the installation guide and use the factory drawing for the final layout.

X Series accessories and test solutions

View chamber accessories and test solutions

X2334 questions

Which salt application system should I order?

Specify direct spray, air-atomized fog or immersion to match the wetting method in your test program. For immersion, provide the dimensions of the loaded fixture so ATC can size the tank and confirm the fill sequence.

Does the wetting method change the climate controls?

All three configurations include Advanced Climate Control and computer-controlled pneumatic cover lifters for the humidity and drying stages.

Request an X2334 quote

Identify the wetting method your customer requires: direct spray, air-atomized fog or immersion. If the callout only says “SAE J2334,” send the drawing or test plan with your inquiry. Include the largest part’s mounted dimensions, quantity per run, fixture weight and available electrical service. For immersion, include the depth needed to cover the mounted parts.